Overview
Update progress on an existing work item: change status, record actual effort, add test results, mark related commits, validate dependencies, and add implementation notes as work progresses.
When to Use
Update a work item when:
- Starting work (change status to
in-progress) - Completing implementation (change status to
ready-for-review) - Recording actual hours spent
- Adding related commit hashes
- Logging test results or CI status
- Adjusting estimates based on new information
- Adding implementation notes or blockers
- Validating dependencies before closing
When NOT to Use
Skip updates for:
- Creating new items (use
create-work-itemskill) - Finalizing and archiving (use
finalize-work-itemskill) - Minor comments (just edit as needed, no skill required)
Frontmatter Fields
Status and Status Reason Fields
status: proposed | ready | in-progress | ready-for-review | closed
status_reason: null | success | obsolete | redundant | superseded | cancelled
| Status | status_reason | Meaning | When to Use |
|---|---|---|---|
proposed |
(none) | Work item proposed but not yet ready | Initial creation |
ready |
(none) | Work item ready to start | Prior to in-progress |
in-progress |
(none) | Active development | Actively working |
ready-for-review |
(none) | Impl done, awaiting review/tests | Tests running, PR submitted |
closed |
success |
Finished successfully | All criteria met, merged |
closed |
obsolete |
No longer relevant | Market changed, approach outdated |
closed |
redundant |
Duplicate item | Same work in another item |
closed |
superseded |
Made moot by other item | Different item solves it better |
closed |
cancelled |
Work stopped | Stopped, won’t implement |
Important: Before transitioning to closed, validate that all items in links.depends_on are already in closed status.
Effort Tracking
estimated: 20 # Set when created (hours as decimal)
actual: 18 # Update as work progresses, finalize when complete
completed_date: null # Set when status = closed (YYYY-MM-DD format)
Guidelines:
estimated: Set once, don’t change unless scope significantly shiftsactual: Start asnull, update when completecompleted_date: Set only when moving to closed status
Commit Tracking
commits:
6d8c044: 'feat(sdk): initial FilterAdapter interface'
f00459b: 'feat(filters): implement selectattr and map'
a1b2c3d: 'docs: add filter usage examples'
Record commit SHAs (7+ character hashes or 40-character full hashes) mapped to their commit messages. Helps trace implementation back to work items.
To get commit message:
git log <short_hash> -n 1 --pretty=format:"%s"
Test Results
test_results:
- timestamp: 2024-06-01T12:00:00Z
note: 'https://github.com/squirrel289/temple/actions/runs/12345678'
Record test results with timestamps:
test_results:
- timestamp: 2024-06-01T12:00:00Z
note: 'All 47 tests pass, coverage 89%'
- timestamp: 2024-06-02T10:00:00Z
note: '3 test failures in test_renderer.py (see PR comments)'
Dependencies
links:
depends_on:
- '[[wi-054_complete_temple_native.md]]'
- '[[wi-043_implement_template_syntax_validation.md]]'
Update if new dependencies emerge during implementation. Critical: Before closing a work item, verify all items in links.depends_on are already closed.
Workflow: Updating Work Items
1. Moving to In-Progress
When starting work (changing status from proposed or ready to in-progress):
-
Automatically create and checkout a local feature branch via
feature-branch-managementskill:# Triggered automatically when status: in-progress feature-branch-management create feature/wi-060- Branch naming convention:
feature/wi-<id>(e.g.,feature/wi-060) - Branch is created from main and checked out automatically
- If the branch already exists, it is checked out
- This ensures all work is isolated and traceable to the work item
- Branch naming convention:
-
Update the work item file frontmatter:
--- title: 'Implement FilterAdapter' id: 'wi-060' status: in-progress priority: high estimated: 20 actual: 2 completed_date: null status_reason: null notes: - timestamp: 2024-06-01T12:00:00Z note: | Started implementation of FilterAdapter in packages/core/. Initial focus: selectattr and map filters. --- -
Update
actualas work progresses:actual: 5 # Increment as work progresses, use decimals (e.g., 5.5 for 5h 30m)
2. Recording Actual Hours
As work progresses, update actual:
estimated: 20
actual: 6 # 2 hours initial + 4 more hours
Update periodically (after major milestones, at end of session) so you have a sense of actual time investment.
3. Adding Related Commits
When work is committed, record the commit SHA and message:
commits:
6d8c044: 'feat(sdk): FilterAdapter interface'
f00459b: 'feat(filters): selectattr and map'
a1b2c3d: 'docs: add filter usage examples'
Use short (7-character) or full (40-character) hashes as keys, with commit subject as the value.
Keep hashes in chronological order. Multiple commits are fineâthey show the evolution of the work.
4. Transitioning to Ready-for-Review
When implementation is done and ready for review, move to ready-for-review:
-
Sync branch with main via
feature-branch-management:# Triggered automatically when status: ready-for-review feature-branch-management sync --base=main- Rebases feature branch on latest main to avoid conflicts
- Ensures clean commit history for PR review
- If conflicts detected, will prompt with suggested resolution steps
-
Create Pull Request via
create-prskill (automatic):# Triggered automatically when status: ready-for-review create-pr work_item=wi-060- PR title auto-generated: “wi-060: Implement FilterAdapter”
- PR description auto-generated from work item notes + commit history
- PR links to work item via “Closes wi-060” reference
- PR URL recorded in work item metadata
-
Update work item frontmatter:
status: ready-for-review actual: 18 # Finalize effort status_reason: null links: pull_requests: - 'https://github.com/templjs/templjs/pull/247' notes: - timestamp: 2024-06-01T12:00:00Z note: | Implementation complete. All filters implemented with type signatures. PR submitted for review: #247 Awaiting code review and approval.
Do NOT set completed_date or status_reason yet.
5. Recording Test Results
After running tests:
status: ready-for-review
test_results:
- timestamp: 2024-06-01T12:00:00Z
note: 'https://github.com/templjs/templjs/actions/runs/98765432'
- timestamp: 2024-06-02T08:00:00Z
note: |
CI results:
- 98 tests pass
- 2 tests fail in test_filter_edge_cases.py (filter_args validation)
- Coverage 87% (target 85%)
Known issues:
- Filter arg validation too strict for varargs
- Will fix in follow-up PR
If tests fail, add notes on what needs fixing. Update status back to in-progress if rework needed:
status: in-progress
actual: 19
test_results:
- timestamp: 2024-06-02T10:00:00Z
note: 'Test failures exposed issue with varargs handling. Reworking in feature/wi-060.'
notes:
- timestamp: 2024-06-02T10:00:00Z
note: 'Tests exposed issue with varargs handling. Working on fix.'
6. Moving to Closed
When all tests pass, work is approved, and PR is merged:
-
Verify dependencies closed: Before moving to
closed, check that all items inlinks.depends_onhavestatus: closed -
Update work item frontmatter:
status: closed status_reason: success actual: 22 completed_date: 2026-02-12 test_results: - timestamp: 2024-06-01T12:00:00Z note: 'https://github.com/templjs/templjs/actions/runs/98765432' links: pull_requests: - 'https://github.com/templjs/templjs/pull/247' commits: a1b2c3d: 'chore: merge PR #247 (FilterAdapter implementation)' notes: - timestamp: 2024-06-02T15:00:00Z note: | All acceptance criteria met: - FilterAdapter interface implemented and documented - Core filters (selectattr, map, join, default) working - 95% test coverage - Code reviewed and approved - Merged to main
Set status_reason to one of:
success: Normal completion with acceptance criteria metobsolete: Item no longer needed (note why in notes)redundant: Duplicate of another item (reference it via links)superseded: Made moot by another item (reference it via links)cancelled: Work stopped before completion (note why in notes)
Leave file in /backlog/. The finalize-work-item skill handles archiving to /backlog/archive/.
7. Adjusting Estimates
If scope changes significantly during work:
estimated: 28 # Increased from 20 due to validation requirements
actual: 14
notes:
- timestamp: 2024-06-01T12:00:00Z
note: |
Scope expanded: discovered need for JSON Schema validation in filter
arguments. Adjusted estimate by +8 hours.
Or revert the work item to proposed if scope change is fundamental:
status: proposed
estimated: 28
actual: 14
notes:
- timestamp: 2024-06-01T12:00:00Z
note: 'Scope significantly expanded. Reverting to proposed for re-estimation.'
8. Updating Dependencies
If new dependencies discovered during work:
links:
depends_on:
- '[[wi-054_complete_temple_native.md]]'
- '[[wi-044_implement_semantic_validation.md]]' # Added: type checking needed
Update the work item file to reflect these. Document in notes why the dependency was added.
Examples
Example 1: Feature Work Progress
Initial creation (status: proposed):
---
title: 'Implement FilterAdapter'
id: 'wi-060'
status: proposed
priority: high
estimated: 20
actual: null
completed_date: null
status_reason: null
links:
depends_on:
- '[[wi-054_complete_temple_native.md]]'
---
After moving to in-progress (2 hours):
status: in-progress
actual: 2
notes:
- timestamp: 2024-06-01T12:00:00Z
note: |
Started with interface design and type signatures.
SelectAttr filter drafted.
After ready-for-review (18 hours):
status: ready-for-review
status_reason: null
actual: 18
commits:
6d8c044: 'feat(sdk): FilterAdapter interface'
f00459b: 'feat(filters): selectattr, map, join, default'
links:
pull_requests:
- 'https://github.com/templjs/templjs/pull/247'
test_results:
- timestamp: 2024-06-01T18:00:00Z
note: 'https://github.com/templjs/templjs/actions/runs/12345678'
notes:
- timestamp: 2024-06-01T18:00:00Z
note: |
Implementation complete. All tests pass. 95% coverage.
PR #247 submitted for review.
After merge to closed (22 hours):
status: closed
status_reason: success
actual: 22
completed_date: 2026-02-12
test_results:
- timestamp: 2024-06-01T18:00:00Z
note: 'https://github.com/templjs/templjs/actions/runs/12345678'
links:
pull_requests:
- 'https://github.com/templjs/templjs/pull/247'
commits:
6d8c044: 'feat(sdk): FilterAdapter interface'
f00459b: 'feat(filters): selectattr, map, join, default'
a1b2c3d: 'merge: PR #247 FilterAdapter implementation'
notes:
- timestamp: 2024-06-02T12:00:00Z
note: |
Merged to main. All acceptance criteria met.
Ready for finalization.
Example 2: Bug Fix with Rework
Starting work:
---
title: 'Fix elif parsing edge case'
id: 'wi-059'
status: in-progress
estimated: 4
actual: 1
---
Test failure (rework needed):
status: in-progress
actual: 3
test_results:
- timestamp: 2024-06-01T10:00:00Z
note: 'Local: 1 test fails in test_parser.py::test_consecutive_elif'
notes:
- timestamp: 2024-06-01T10:00:00Z
note: |
Found deeper issue: elif blocks interfere when nested.
Need to refactor block termination logic.
Revising approachâeffort may exceed estimate.
Resolution (ready-for-review):
status: ready-for-review
actual: 7
estimated: 4
commits:
abc1234: 'fix(parser): elif block termination logic'
test_results:
- timestamp: 2024-06-01T14:00:00Z
note: 'https://github.com/templjs/templjs/actions/runs/87654321'
notes:
- timestamp: 2024-06-01T14:00:00Z
note: |
Fixed by refactoring block_ends() logic. Took longer due to edge cases.
All tests now pass including new consecutive_elif tests.
PR submitted for review.
Example 3: Spike/Research Update
---
title: 'Evaluate expression engines'
id: 'wi-061'
status: in-progress
estimated: 16
actual: 8
notes:
- timestamp: 2024-06-01T08:00:00Z
note: |
Evaluation candidates:
1. JMESPath - mature, good for JSON, limited type support
2. Custom recursive descent - flexible, small footprint
3. meval - lightweight Python evaluator
Progress:
- JMESPath prototype working (2h)
- Custom parser WIP (6h) - complexity clear now, drafting comparison doc
Leaning toward option 2 (custom) due to control of type system.
---
Tips & Conventions
Atomic Updates
Each update should correspond to a logical work milestone:
- End of session: time tracking
- After tests run: test results
- After commit: commit hash
- Status change: full progress summary
Don’t update work items excessivelyâfocus on meaningful changes.
Notes Field
Use notes for:
- Progress summary
- Blockers or issues
- Scope changes
- Decision points
- Follow-up items
Avoid: detailed implementation notes (keep in commit messages instead)
Time Tracking Accuracy
Record hours regularly:
- At end of each session
- After significant milestone
- Final tally when completed
Use decimals for partial hours (e.g., 5.5 for 5 hours 30 minutes).
Commit Message Integration
Reference work items in commit messages:
feat(filters): implement selectattr and map
Implements core filtering operations for FilterAdapter.
Supports filtering sequences by attribute value and projection.
Closes wi-60
See backlog/wi-060_implement_filter_adapter.md
Then update the work item with the commit hash.
Dependency Validation
Before marking a work item as closed:
- Check the
links.depends_onsection - Verify each referenced work item has
status: closed - If any
depends_onitems are not closed, leave this item atready-for-reviewwith a note explaining what’s blocking closure
Example:
status: ready-for-review
notes:
- timestamp: 2024-06-02T15:00:00Z
note: |
Implementation complete and tested. Awaiting closure of:
- [[wi-054_complete_temple_native.md]] (currently in-progress)
- [[wi-043_implement_syntax_validation.md]] (currently ready-for-review)
Ready to move to closed once dependencies are resolved.
Common Patterns
Weekly Status Update
Review active work items weekly:
status: in-progress
actual: 12 # Update from 10
notes:
- timestamp: 2024-06-08T17:00:00Z
note: |
Week of Feb 10: 2 hours progress (mid-week catchup).
Current blockers: Decision on filter signature formatâwaiting for architecture review.
Expected completion: Feb 17
Handling Blockers
notes:
- timestamp: 2024-06-01T14:00:00Z
note: |
BLOCKED: Waiting for ADR-006 decision on expression language.
Cannot finalize filter syntax without it.
Unblocked when: ADR merged and decision published
Impact: Pushed completion target to 2026-02-20
Scope Creep Recognition
notes:
- timestamp: 2024-06-01T14:00:00Z
note: |
Original estimate: 12 hours (selectattr, map, join)
Current scope: +default filter + type validation = ~18 hours likely
Recommendation: Create follow-up item for advanced filters, limit this to core 3.
Tips & Conventions
Atomic Updates
Each update should correspond to a logical work milestone:
- End of session: time tracking
- After tests run: test results
- After commit: commit hash
- Status change: full progress summary
Don’t update work items excessivelyâfocus on meaningful changes.
Notes Field
Use notes for:
- Progress summary
- Blockers or issues
- Scope changes
- Decision points
- Follow-up items
Avoid: detailed implementation notes (keep in commit messages instead)
Time Tracking Accuracy
Record hours regularly:
- At end of each session
- After significant milestone
- Final tally when completed
Use decimals for partial hours (e.g., 5.5 for 5 hours 30 minutes).
Commit Message Integration
Reference work items in commit messages:
feat(filters): implement selectattr and map
Implements core filtering operations for FilterAdapter.
Supports filtering sequences by attribute value and projection.
Closes wi-60
See backlog/wi-060_implement_filter_adapter.md
Then update the work item with the commit hash.
Related Skills
create-work-item: For creating new work items from scratchfeature-branch-management: Invoked automatically on status transitions (create branch on in-progress, sync on ready-for-review)create-pr: Invoked automatically when status â ready-for-review (create PR from feature branch)handle-pr-feedback: For addressing PR review feedback and managing reworkresolve-pr-comments: For addressing specific code review commentsfinalize-work-item: For archiving completed work items after mergegit-commit: For recording commits that can be linked incommits