Documentation Creation Criteria

Creation Decision Matrix

Condition Required Documents Creation Order
New Feature Addition PRD -> [ADR] -> Design Doc -> Work Plan After PRD approval
ADR Conditions Met (see below) ADR -> Design Doc -> Work Plan Start immediately
6+ Files ADR -> Design Doc -> Work Plan (Required) Start immediately
3-5 Files Design Doc -> Work Plan (Recommended) Start immediately
1-2 Files None Direct implementation

ADR Creation Conditions (Required if Any Apply)

1. Type System Changes

  • Adding nested types with 3+ levels: type A = { b: { c: { d: T } } }
    • Rationale: Deep nesting has high complexity and wide impact scope
  • Changing/deleting types used in 3+ locations
    • Rationale: Multiple location impacts require careful consideration
  • Type responsibility changes (e.g., DTO->Entity)
    • Rationale: Conceptual model changes affect design philosophy

2. Data Flow Changes

  • Storage location changes (DB->File, Memory->Cache)
  • Processing order changes with 3+ steps
    • Example: “Input->Validation->Save” to “Input->Save->Async Validation”
  • Data passing method changes (props->Context, direct reference->events)

3. Architecture Changes

  • Layer addition, responsibility changes, component relocation

4. External Dependency Changes

  • Library/framework/external API introduction or replacement

5. Complex Implementation Logic (Regardless of Scale)

  • Managing 3+ states
  • Coordinating 5+ asynchronous processes

Detailed Document Definitions

PRD (Product Requirements Document)

Purpose: Define business requirements and user value

Includes:

  • Business requirements and user value
  • Success metrics and KPIs (measurable format)
  • User stories and use cases
  • MoSCoW prioritization (Must/Should/Could/Won’t)
  • MVP and Future phase separation
  • User journey diagram (required)
  • Scope boundary diagram (required)

Excludes:

  • Technical implementation details (->Design Doc)
  • Technical selection rationale (->ADR)
  • Implementation phases (->Work Plan)
  • Task breakdown (->Work Plan)

ADR (Architecture Decision Record)

Purpose: Record technical decision rationale and background

Includes:

  • Decision (what was selected)
  • Rationale (why that selection was made)
  • Option comparison (minimum 3 options) and trade-offs
  • Architecture impact
  • Principled implementation guidelines (e.g., “Use dependency injection”)

Excludes:

  • Implementation schedule, duration (->Work Plan)
  • Detailed implementation procedures (->Design Doc)
  • Specific code examples (->Design Doc)
  • Resource assignments (->Work Plan)

Design Document

Purpose: Define technical implementation methods in detail

Includes:

  • Existing codebase analysis (required)
    • Implementation path mapping (both existing and new)
    • Integration point clarification (connection points with existing code even for new implementations)
  • Technical implementation approach (vertical/horizontal/hybrid)
  • Technical dependencies and implementation constraints (required implementation order)
  • Interface and type definitions
  • Data flow and component design
  • E2E verification procedures at integration points
  • Acceptance criteria (EARS format: When/While/If-then/none)
  • Change impact map (clearly specify direct impact/indirect impact/no ripple effect)
  • Complete enumeration of integration points
  • Data contract clarification
  • Agreement checklist (agreements with stakeholders)
  • Code inspection evidence (inspected files/functions during investigation)
  • Field propagation map (when fields cross component boundaries)
  • Data representation decision (when introducing new structures)
  • Applicable standards (explicit/implicit classification)
  • Prerequisite ADRs (including common ADRs)

Excludes:

  • Why that technology was chosen (->Reference ADR)
  • When to implement, duration (->Work Plan)
  • Who will implement (->Work Plan)

Work Plan

Purpose: Implementation task management and progress tracking

Includes:

  • Task breakdown and dependencies (maximum 2 levels)
  • Schedule and duration estimates
  • Copy E2E verification procedures from Design Doc (cannot delete, can add)
  • Phase 4 Quality Assurance Phase (required)
  • Progress records (checkbox format)

Excludes:

  • Technical rationale (->ADR)
  • Design details (->Design Doc)

Phase Division Criteria:

  1. Phase 1: Foundation Implementation – Type definitions, interfaces, test preparation
  2. Phase 2: Core Feature Implementation – Business logic, unit tests
  3. Phase 3: Integration Implementation – External connections, presentation layer
  4. Phase 4: Quality Assurance (Required) – Acceptance criteria achievement, all tests passing, quality checks

Three Elements of Task Completion Definition:

  1. Implementation Complete: Code is functional
  2. Quality Complete: Tests, type checks, linting pass
  3. Integration Complete: Verified connection with other components

Creation Process

  1. Problem Analysis: Change scale assessment, ADR condition check
    • Identify explicit and implicit project standards before investigation
  2. ADR Option Consideration (ADR only): Compare 3+ options, specify trade-offs
  3. Creation: Use templates, include measurable conditions
  4. Approval: “Accepted” after review enables implementation

Storage Locations

Document Path Naming Convention Template
PRD docs/prd/ [feature-name]-prd.md See prd-template.md
ADR docs/adr/ ADR-[4-digits]-[title].md See adr-template.md
Design Doc docs/design/ [feature-name]-design.md See design-template.md
Work Plan docs/plans/ YYYYMMDD-{type}-{description}.md See plan-template.md
Task File docs/plans/tasks/ {plan-name}-task-{number}.md See task-template.md

*Note: Work plans are excluded by .gitignore

ADR Status

Proposed -> Accepted -> Deprecated/Superseded/Rejected

AI Automation Rules

  • 5+ files: Suggest ADR creation
  • Type/data flow change detected: ADR mandatory
  • Check existing ADRs before implementation

Diagram Requirements

Required diagrams for each document (using mermaid notation):

Document Required Diagrams Purpose
PRD User journey diagram, Scope boundary diagram Clarify user experience and scope
ADR Option comparison diagram (when needed) Visualize trade-offs
Design Doc Architecture diagram, Data flow diagram Understand technical structure
Work Plan Phase structure diagram, Task dependency diagram Clarify implementation order

Common ADR Relationships

  1. At creation: Identify common technical areas (logging, error handling, async processing, etc.), reference existing common ADRs
  2. When missing: Consider creating necessary common ADRs
  3. Design Doc: Specify common ADRs in “Prerequisite ADRs” section
  4. Compliance check: Verify design aligns with common ADR decisions

Templates

Templates are available in the references/ directory: