startup-pivoting
npx skills add https://github.com/liqiongyu/lenny_skills_plus --skill startup-pivoting
Agent 安装分布
Skill 文档
Startup Pivoting
Scope
Covers
- Deciding whether to pivot vs persevere when a product/startup is stuck (typically pre- or early-PMF)
- Turning a pivot debate into an executable Pivot Decision & Execution Pack (not vibes)
- Designing a time-boxed pivot validation + execution plan with clear decision gates
When to use
- âShould we pivot?â
- âWeâre stuck pre-PMF / growth has stalled.â
- âWe think the ICP/market is wrongâhelp us change direction.â
- âWe need a pivot options map and a concrete plan to validate one quickly.â
- âMake a pivot decision memo we can share with the team/investors.â
When NOT to use
- You donât have a product or real customer evidence yet (do discovery/problem framing first, e.g.,
problem-definition) - You only need incremental optimization (pricing tests, onboarding tweaks, activation/retention work) and direction is not in question
- Youâre choosing between many roadmap bets within an agreed strategy (use
prioritizing-roadmap) - You want the agent to âpick a new startup ideaâ from scratch (use
startup-ideation)
Human checkpoint (required)
- A pivot is a high-stakes strategic decision. This skill produces decision-ready artifacts and a plan, but a human owner must make the final call.
Inputs
Minimum required
- What you sell/build today (product summary + current target customer)
- The âstuckâ symptoms + evidence (metrics, user feedback, pipeline, retention/churn, qualitative signals)
- Runway/timebox (months of runway or a decision deadline)
- Constraints/non-negotiables (compliance, brand/trust, margins, platform, team capabilities)
- Current âtheory of winningâ (who + problem + why you win)
Missing-info strategy
- Ask up to 5 questions from references/INTAKE.md.
- If answers arenât available, proceed with explicit assumptions and offer 2 scope options (lean 60â90 min analysis vs thorough 1â2 day pack).
Outputs (deliverables)
Produce a Pivot Decision & Execution Pack in Markdown (in-chat; or as files if requested):
- Context snapshot (whatâs true today; constraints; runway; decision owner)
- Stuck diagnosis (symptoms â likely causes â evidence gaps)
- Exhaustion check (âhave we exhausted the possibilities?â) + the last best non-pivot moves (time-boxed)
- Pivot options map (4P pivot grid + 10% vs 200% classification)
- Chosen pivot thesis (who/problem/promise) + success metrics + kill criteria
- Validation plan (customer learning + experiments; decision gates; what would change your mind)
- Execution plan (pivot sprint plan; cut list; resourcing; comms; risks)
- Risks / Open questions / Next steps (always included)
Templates: references/TEMPLATES.md
Expanded guidance: references/WORKFLOW.md
Workflow (7 steps)
1) Frame the decision (and the clock)
- Inputs: Request + runway/timebox + references/INTAKE.md.
- Actions: Define the decision: pivot vs persevere vs shut down (or âpivot A vs pivot Bâ). Name the decision owner and the decision date. Capture non-negotiables.
- Outputs: Context snapshot + decision statement.
- Checks: The decision is binary/explicit and time-bounded (no âletâs think about itâ).
2) Diagnose whatâs actually âstuckâ
- Inputs: Metrics, funnel, retention/churn, pipeline, user feedback, win/loss notes.
- Actions: Summarize symptoms and hypothesize causes. Separate signal (real demand/value issues) from execution (distribution/onboarding/pricing) issues.
- Outputs: Stuck diagnosis + evidence inventory + top evidence gaps.
- Checks: You can state the top 1â3 bottlenecks and what data would falsify them.
3) Run the exhaustion check (Butterfield rule)
- Inputs: Stuck diagnosis + constraints + prior attempts.
- Actions: Use references/TEMPLATES.md to complete the Exhaustion Check: list the most credible non-pivot levers and whether they were tried well. Identify the âlast bestâ 1â3 non-pivot moves worth time-boxing (if any).
- Outputs: Exhaustion Check + time-boxed âlast best triesâ plan (or explicit rationale for skipping).
- Checks: If you recommend pivoting, you can explain why remaining non-pivot levers are unlikely/too slow vs runway.
4) Generate pivot options (require at least one 200% pivot)
- Inputs: Theory of winning + evidence + constraints.
- Actions: Create 4â8 options using a 4P pivot grid (Problem, Persona, Product, Positioning/Package). Classify each as ~10% (small tweak) vs 200% (meaningfully different bet). Include at least one 200% option.
- Outputs: Pivot options map with a short âwhy this could winâ and âwhat would have to be trueâ.
- Checks: Each option is distinct, falsifiable, and has a plausible path to distribution.
5) Select a pivot thesis + metrics + kill criteria
- Inputs: Options map + decision criteria (runway, strengths, market, moat).
- Actions: Pick the best option (or top 2). Write a Pivot Thesis Card and define success metrics (North Star + 2â5 leading indicators) plus guardrails. Define kill criteria and a decision gate date.
- Outputs: Pivot thesis + metrics + kill criteria.
- Checks: Metrics are computable; kill criteria are real (not âkeep going until it worksâ).
6) Build the validation + execution plan (Todd Jackson rule)
- Inputs: Pivot thesis + runway + team capacity.
- Actions: Create a time-boxed pivot sprint: customer learning plan, experiments, build scope, and what to stop building. Include a comms plan (team/investors/customers) and a rollback/exit plan if results fail.
- Outputs: Validation plan + execution plan (owners, timeline, decision gates).
- Checks: Plan fits runway; includes a cut list; includes at least one âhard truthâ test that could disconfirm the thesis.
7) Quality gate + finalize pack
- Inputs: Full draft pack.
- Actions: Run references/CHECKLISTS.md and score with references/RUBRIC.md. Add Risks / Open questions / Next steps and confirm the human checkpoint (decision owner/date).
- Outputs: Final Pivot Decision & Execution Pack.
- Checks: A stakeholder can read it async and understand: (a) why youâre pivoting, (b) what youâll do, (c) how youâll know, (d) when youâll decide.
Quality gate (required)
- Use references/CHECKLISTS.md and references/RUBRIC.md.
- Always include: Risks, Open questions, Next steps.
Examples
Example 1 (B2B SaaS stuck pre-PMF): âWe built an AI support copilot for SMBs. Trials convert, but retention is poor and sales cycles are long. We have 6 months of runway. Should we pivot, and if so how?â
Expected: a Pivot Decision & Execution Pack with an exhaustion check (pricing/onboarding/ICP), 4â8 pivot options including at least one 200% pivot, a chosen thesis with metrics/kill criteria, and a 4â6 week pivot sprint plan.
Example 2 (Consumer plateau): âOur language learning app growth stalled and D30 retention is low. We suspect our promise is wrong. Create a pivot options map and a validation plan.â
Expected: a 4P pivot grid that includes positioning/package changes and at least one new persona/problem angle, plus a time-boxed validation plan with decision gates.
Boundary example: âJust tell us what to pivot toâno metrics, no customers, no constraints.â
Response: explain that pivoting without evidence is guesswork; ask 3â5 intake questions, propose a discovery/validation sprint, and only then produce a pivot thesis and plan.