Plot: Sprint

Sprints are not plans. Plans track what to build; sprints track when to ship it. Sprint files live in docs/sprints/, committed directly to main — no PR, no review gate. Principle 2 (“Plans merge before implementation”) does not apply to sprints.

Input: $ARGUMENTS determines the subcommand.

Form Action
/plot-sprint Status (infer slug or list all)
/plot-sprint <slug> Status of slug (or create if not found)
/plot-sprint <slug> commit Lock sprint contents
/plot-sprint <slug> start Begin the sprint
/plot-sprint <slug> close End timebox, capture retro
/plot-sprint <slug>: <goal> Create slug with goal

Argument parsing: $ARGUMENTS = [<slug>] [<subcommand>] [<args>]

  • $ARGUMENTS[0] → slug (first word, if present)
  • $ARGUMENTS[1] → subcommand: commit, start, close
  • Create detected by : in slug token (e.g. week-1: Ship auth)
  • If no slug given: discover from docs/sprints/active/ — one active sprint → use it, multiple → list and ask, none → offer to create

Setup

Add a ## Plot Config section to the adopting project’s CLAUDE.md:

## Plot Config
- **Project board:** <your-project-name> (#<number>)  <!-- optional, for `gh pr edit --add-project` -->
- **Branch prefixes:** idea/, feature/, bug/, docs/, infra/
- **Plan directory:** docs/plans/
- **Active index:** docs/plans/active/
- **Delivered index:** docs/plans/delivered/
- **Sprint directory:** docs/sprints/

Model Guidance

Steps Min. Tier Notes
Create, commit, start, status Small Git commands, templates, file ops
Close Mid Checkbox parsing + reading plan files to check delivery status of [slug] refs

All sprint operations are structural (Small or Mid). No Frontier needed.

Sprint Lifecycle

flowchart LR
    A["/plot-sprint<br/><slug>: <goal>"] -->|"⏸ drafting"| B["Planning"]
    B -->|"⏳ /plot-sprint commit"| C["Committed"]
    C -->|"⚡ /plot-sprint start"| D["Active"]
    D -->|"⏳ /plot-sprint close"| E["Closed"]

Legend: ⚡ automate ASAP · ⏸ natural pause · ⏳ human-paced

Guardrail

Sprint files must not contain ## Design or ## Approach sections. If detected, warn: “This looks like a plan, not a sprint. Use /plot-idea for plans.”

Subcommands

Create: /plot-sprint <slug>: <goal>

Create a new sprint in Planning phase.

Pacing: ⏸ natural pause (drafting)

1. Parse Input

Extract <slug> (before the colon) and <goal> (after the colon). Both are required.

  • Slug: trimmed, lowercase, hyphens only
  • Goal: the sprint goal as a sentence

If no colon or missing parts: “Usage: /plot-sprint <slug>: <goal>

2. Determine ISO Week Prefix

Derive the ISO week prefix from today’s date for the filename:

WEEK_PREFIX=$(date -u +%Y-W%V)

The sprint file will be named docs/sprints/${WEEK_PREFIX}-<slug>.md.

3. Pre-flight Checks

ls docs/sprints/${WEEK_PREFIX}-<slug>.md 2>/dev/null

If file exists: “Sprint <slug> already exists for week ${WEEK_PREFIX}.”

4. Discover Active Plans

List active plans so the user can add them to the sprint:

ls docs/plans/active/ 2>/dev/null

If plans exist, present: “Found N active plans. Add any to this sprint?” List them and let the user select which to include (or none). Selected plans are added as [slug] items under the appropriate MoSCoW tier.

5. Create Sprint File

mkdir -p docs/sprints

Write docs/sprints/${WEEK_PREFIX}-<slug>.md:

# Sprint: <title derived from goal>

> <goal>

## Status

- **Phase:** Planning
- **Start:** YYYY-MM-DD
- **End:** YYYY-MM-DD

## Sprint Goal

<goal expanded if needed>

### Must Have

- [ ] <items from user selection or empty>

### Should Have

<!-- add items here -->

### Could Have

<!-- add items here -->

### Deferred

<!-- Items moved here during sprint when they won't make the timebox -->

## Retrospective

<!-- Filled during /plot-sprint close: What went well / What could improve / Action items -->

## Notes

<!-- Session log, decisions, links -->

Item format: - [ ] [slug] description (plan reference) or - [ ] description (lightweight task).

Leave Start/End dates as placeholders — the user fills them during the Planning phase.

6. Update Plan Files

For each plan-backed item ([slug]) added in step 4, update the referenced plan file to record sprint membership:

  • Resolve the plan file via docs/plans/active/<slug>.md
  • Add - **Sprint:** <sprint-slug> to its ## Status section (after the Phase line)

This enables sprint awareness in /plot-approve and /plot-deliver.

7. Commit to Main

Sprint files are committed directly to main (include any updated plan files):

git add docs/sprints/${WEEK_PREFIX}-<slug>.md docs/plans/
git commit -m "sprint: create <slug>"
git push

8. Summary

Print:

  • Created: docs/sprints/${WEEK_PREFIX}-<slug>.md
  • Phase: Planning
  • Plan files updated: N (if any)
  • Next: add items, set dates, then /plot-sprint <slug> commit when ready

Commit: /plot-sprint <slug> commit

Lock sprint contents. Team has agreed on what’s in scope.

Pacing: ⏳ human-paced (team agreement)

1. Find Sprint File

ls docs/sprints/*-<slug>.md 2>/dev/null

If not found: “No sprint found for <slug>.”

Read the sprint file. Check Phase field:

  • If not Planning: “Sprint is in <phase> phase, not Planning. Cannot commit.”

2. Validate End Date

Check that the **End:** field has a real date (not the placeholder YYYY-MM-DD).

If missing or placeholder: “Set an end date before committing. Edit the sprint file directly.”

3. Update Phase

Change **Phase:** Planning → **Phase:** Committed

4. Commit

git add docs/sprints/*-<slug>.md
git commit -m "sprint: commit <slug>"
git push

5. Summary

Print:

  • Committed: <slug>
  • End date: <end date>
  • Items: N must-haves, N should-haves, N could-haves
  • Next: /plot-sprint <slug> start when the sprint begins

Start: /plot-sprint <slug> start

Begin the sprint. Creates the active symlink.

Pacing: ⚡ automate ASAP (mechanical transition)

1. Find and Validate Sprint File

Find sprint file, check Phase is Committed.

2. Create Active Symlink

mkdir -p docs/sprints/active
ln -s ../${WEEK_PREFIX}-<slug>.md docs/sprints/active/<slug>.md

3. Update Phase

Change **Phase:** Committed → **Phase:** Active

4. Commit

git add docs/sprints/*-<slug>.md docs/sprints/active/<slug>.md
git commit -m "sprint: start <slug>"
git push

5. Summary

Print:

  • Started: <slug>
  • End date: <end date>
  • Active symlink: docs/sprints/active/<slug>.md
  • Next: work on sprint items. When timebox ends, /plot-sprint <slug> close

Close: /plot-sprint <slug> close

End the timebox. Check MoSCoW completeness and capture retrospective.

Pacing: ⏳ human-paced (retrospective)

1. Find and Validate Sprint File

Find sprint file, check Phase is Active.

2. MoSCoW Completeness Check

Parse the sprint file for checkbox items in each tier:

  • Count checked - [x] vs unchecked - [ ] items per tier
  • For plan-backed items ([slug]), check if the referenced plan is delivered (exists in docs/plans/delivered/)

Present results:

Must Have:  2/4 complete
Should Have: 1/2 complete
Could Have:  0/1 complete

If must-haves are incomplete, present three options:

  1. Close anyway (must-haves stay unchecked in place)
  2. Move incomplete must-haves to Deferred — move each unchecked - [ ] line from ### Must Have to ### Deferred, preserving the original text
  3. Hold off (don’t close yet)

3. Capture Retrospective

Ask the user: “Add a retrospective? (optional)”

If yes, prompt for:

  • What went well?
  • What could improve?
  • Action items for next sprint?

Fill the ## Retrospective section using this structure:

## Retrospective

### What went well
- <items>

### What could improve
- <items>

### Action items
- [ ] <items>

4. Update Phase and Remove Symlink

Change **Phase:** Active → **Phase:** Closed

git rm docs/sprints/active/<slug>.md
git add docs/sprints/*-<slug>.md
git commit -m "sprint: close <slug>"
git push

5. Summary

Print:

  • Closed: <slug>
  • Must-haves: N/M complete
  • Deferred: N items (if any moved)
  • Retrospective: captured / skipped

Status: /plot-sprint or /plot-sprint <slug>

Show sprint status.

1. Resolve Slug

If slug provided ($ARGUMENTS[0] present, no subcommand):

  • Find sprint file: ls docs/sprints/*-<slug>.md 2>/dev/null
  • Found → show status for that sprint (step 2)
  • Not found → “No sprint <slug> found. Create it with /plot-sprint <slug>: <goal>

If no arguments:

  • List active sprints: ls docs/sprints/active/ 2>/dev/null
  • One active sprint → use it, show status (step 2)
  • Multiple → list all active sprints with summary
  • None → “No active sprints. Create one with /plot-sprint <slug>: <goal>

2. For Each Sprint

Read the sprint file and display:

  • Sprint name and goal
  • Phase
  • Time remaining (days until end date; “ended N days ago” if past)
  • MoSCoW progress: Must N/M, Should N/M, Could N/M

3. Summary

## Active Sprints

- `<slug>` — "<goal>" | 3 days remaining | Must: 2/4 | Should: 1/2 | Could: 0/1