risk-management-specialist

📁 alirezarezvani/claude-skills 📅 Jan 19, 2026
101
总安装量
100
周安装量
#2276
全站排名
安装命令
npx skills add https://github.com/alirezarezvani/claude-skills --skill risk-management-specialist

Agent 安装分布

claude-code 89
opencode 69
gemini-cli 68
cursor 59
codex 58

Skill 文档

Risk Management Specialist

ISO 14971:2019 risk management implementation throughout the medical device lifecycle.


Table of Contents


Risk Management Planning Workflow

Establish risk management process per ISO 14971.

Workflow: Create Risk Management Plan

  1. Define scope of risk management activities:
    • Medical device identification
    • Lifecycle stages covered
    • Applicable standards and regulations
  2. Establish risk acceptability criteria:
    • Define probability categories (P1-P5)
    • Define severity categories (S1-S5)
    • Create risk matrix with acceptance thresholds
  3. Assign responsibilities:
    • Risk management lead
    • Subject matter experts
    • Approval authorities
  4. Define verification activities:
    • Methods for control verification
    • Acceptance criteria
  5. Plan production and post-production activities:
    • Information sources
    • Review triggers
    • Update procedures
  6. Obtain plan approval
  7. Establish risk management file
  8. Validation: Plan approved; acceptability criteria defined; responsibilities assigned; file established

Risk Management Plan Content

Section Content Evidence
Scope Device and lifecycle coverage Scope statement
Criteria Risk acceptability matrix Risk matrix document
Responsibilities Roles and authorities RACI chart
Verification Methods and acceptance Verification plan
Production/Post-Production Monitoring activities Surveillance plan

Risk Acceptability Matrix (5×5)

Probability \ Severity Negligible Minor Serious Critical Catastrophic
Frequent (P5) Medium High High Unacceptable Unacceptable
Probable (P4) Medium Medium High High Unacceptable
Occasional (P3) Low Medium Medium High High
Remote (P2) Low Low Medium Medium High
Improbable (P1) Low Low Low Medium Medium

Risk Level Actions

Level Acceptable Action Required
Low Yes Document and accept
Medium ALARP Reduce if practicable; document rationale
High ALARP Reduction required; demonstrate ALARP
Unacceptable No Design change mandatory

Risk Analysis Workflow

Identify hazards and estimate risks systematically.

Workflow: Conduct Risk Analysis

  1. Define intended use and reasonably foreseeable misuse:
    • Medical indication
    • Patient population
    • User population
    • Use environment
  2. Select analysis method(s):
    • FMEA for component/function analysis
    • FTA for system-level analysis
    • HAZOP for process deviations
    • Use Error Analysis for user interaction
  3. Identify hazards by category:
    • Energy hazards (electrical, mechanical, thermal)
    • Biological hazards (bioburden, biocompatibility)
    • Chemical hazards (residues, leachables)
    • Operational hazards (software, use errors)
  4. Determine hazardous situations:
    • Sequence of events
    • Foreseeable misuse scenarios
    • Single fault conditions
  5. Estimate probability of harm (P1-P5)
  6. Estimate severity of harm (S1-S5)
  7. Document in hazard analysis worksheet
  8. Validation: All hazard categories addressed; all hazards documented; probability and severity assigned

Hazard Categories Checklist

Category Examples Analyzed
Electrical Shock, burns, interference ☐
Mechanical Crushing, cutting, entrapment ☐
Thermal Burns, tissue damage ☐
Radiation Ionizing, non-ionizing ☐
Biological Infection, biocompatibility ☐
Chemical Toxicity, irritation ☐
Software Incorrect output, timing ☐
Use Error Misuse, perception, cognition ☐
Environment EMC, mechanical stress ☐

Analysis Method Selection

Situation Recommended Method
Component failures FMEA
System-level failure FTA
Process deviations HAZOP
User interaction Use Error Analysis
Software behavior Software FMEA
Early design phase PHA

Probability Criteria

Level Name Description Frequency
P5 Frequent Expected to occur >10⁻³
P4 Probable Likely to occur 10⁻³ to 10⁻⁴
P3 Occasional May occur 10⁻⁴ to 10⁻⁵
P2 Remote Unlikely 10⁻⁵ to 10⁻⁶
P1 Improbable Very unlikely <10⁻⁶

Severity Criteria

Level Name Description Harm
S5 Catastrophic Death Death
S4 Critical Permanent impairment Irreversible injury
S3 Serious Injury requiring intervention Reversible injury
S2 Minor Temporary discomfort No treatment needed
S1 Negligible Inconvenience No injury

See: references/risk-analysis-methods.md


Risk Evaluation Workflow

Evaluate risks against acceptability criteria.

Workflow: Evaluate Identified Risks

  1. Calculate initial risk level from probability × severity
  2. Compare to risk acceptability criteria
  3. For each risk, determine:
    • Acceptable: Document and accept
    • ALARP: Proceed to risk control
    • Unacceptable: Mandatory risk control
  4. Document evaluation rationale
  5. Identify risks requiring benefit-risk analysis
  6. Complete benefit-risk analysis if applicable
  7. Compile risk evaluation summary
  8. Validation: All risks evaluated; acceptability determined; rationale documented

Risk Evaluation Decision Tree

Risk Estimated
      │
      ▼
Apply Acceptability Criteria
      │
      ├── Low Risk ──────────► Accept and document
      │
      ├── Medium Risk ───────► Consider risk reduction
      │   │                    Document ALARP if not reduced
      │   ▼
      │   Practicable to reduce?
      │   │
      │   Yes──► Implement control
      │   No───► Document ALARP rationale
      │
      ├── High Risk ─────────► Risk reduction required
      │   │                    Must demonstrate ALARP
      │   ▼
      │   Implement control
      │   Verify residual risk
      │
      └── Unacceptable ──────► Design change mandatory
                               Cannot proceed without control

ALARP Demonstration Requirements

Criterion Evidence Required
Technical feasibility Analysis of alternative controls
Proportionality Cost-benefit of further reduction
State of the art Comparison to similar devices
Stakeholder input Clinical/user perspectives

Benefit-Risk Analysis Triggers

Situation Benefit-Risk Required
Residual risk remains high Yes
No feasible risk reduction Yes
Novel device Yes
Unacceptable risk with clinical benefit Yes
All risks low No

Risk Control Workflow

Implement and verify risk control measures.

Workflow: Implement Risk Controls

  1. Identify risk control options:
    • Inherent safety by design (Priority 1)
    • Protective measures in device (Priority 2)
    • Information for safety (Priority 3)
  2. Select optimal control following hierarchy
  3. Analyze control for new hazards introduced
  4. Document control in design requirements
  5. Implement control in design
  6. Develop verification protocol
  7. Execute verification and document results
  8. Evaluate residual risk with control in place
  9. Validation: Control implemented; verification passed; residual risk acceptable; no unaddressed new hazards

Risk Control Hierarchy

Priority Control Type Examples Effectiveness
1 Inherent Safety Eliminate hazard, fail-safe design Highest
2 Protective Measures Guards, alarms, automatic shutdown High
3 Information Warnings, training, IFU Lower

Risk Control Option Analysis Template

RISK CONTROL OPTION ANALYSIS

Hazard ID: H-[XXX]
Hazard: [Description]
Initial Risk: P[X] × S[X] = [Level]

OPTIONS CONSIDERED:
| Option | Control Type | New Hazards | Feasibility | Selected |
|--------|--------------|-------------|-------------|----------|
| 1 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
| 2 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |

SELECTED CONTROL: Option [X]
Rationale: [Justification for selection]

IMPLEMENTATION:
- Requirement: [REQ-XXX]
- Design Document: [Reference]

VERIFICATION:
- Method: [Test/Analysis/Review]
- Protocol: [Reference]
- Acceptance Criteria: [Criteria]

Risk Control Verification Methods

Method When to Use Evidence
Test Quantifiable performance Test report
Inspection Physical presence Inspection record
Analysis Design calculation Analysis report
Review Documentation check Review record

Residual Risk Evaluation

After Control Action
Acceptable Document, proceed
ALARP achieved Document rationale, proceed
Still unacceptable Additional control or design change
New hazard introduced Analyze and control new hazard

Post-Production Risk Management

Monitor and update risk management throughout product lifecycle.

Workflow: Post-Production Risk Monitoring

  1. Identify information sources:
    • Customer complaints
    • Service reports
    • Vigilance/adverse events
    • Literature monitoring
    • Clinical studies
  2. Establish collection procedures
  3. Define review triggers:
    • New hazard identified
    • Increased frequency of known hazard
    • Serious incident
    • Regulatory feedback
  4. Analyze incoming information for risk relevance
  5. Update risk management file as needed
  6. Communicate significant findings
  7. Conduct periodic risk management review
  8. Validation: Information sources monitored; file current; reviews completed per schedule

Information Sources

Source Information Type Review Frequency
Complaints Use issues, failures Continuous
Service Field failures, repairs Monthly
Vigilance Serious incidents Immediate
Literature Similar device issues Quarterly
Regulatory Authority feedback As received
Clinical PMCF data Per plan

Risk Management File Update Triggers

Trigger Response Time Action
Serious incident Immediate Full risk review
New hazard identified 30 days Risk analysis update
Trend increase 60 days Trend analysis
Design change Before implementation Impact assessment
Standards update Per transition period Gap analysis

Periodic Review Requirements

Review Element Frequency
Risk management file completeness Annual
Risk control effectiveness Annual
Post-market information analysis Quarterly
Risk-benefit conclusions Annual or on new data

Risk Assessment Templates

Hazard Analysis Worksheet

HAZARD ANALYSIS WORKSHEET

Product: [Device Name]
Document: HA-[Product]-[Rev]
Analyst: [Name]
Date: [Date]

| ID | Hazard | Hazardous Situation | Harm | P | S | Initial Risk | Control | Residual P | Residual S | Final Risk |
|----|--------|---------------------|------|---|---|--------------|---------|------------|------------|------------|
| H-001 | [Hazard] | [Situation] | [Harm] | [1-5] | [1-5] | [Level] | [Control ref] | [1-5] | [1-5] | [Level] |

FMEA Worksheet

FMEA WORKSHEET

Product: [Device Name]
Subsystem: [Subsystem]
Analyst: [Name]
Date: [Date]

| ID | Item | Function | Failure Mode | Effect | S | Cause | O | Control | D | RPN | Action |
|----|------|----------|--------------|--------|---|-------|---|---------|---|-----|--------|
| FM-001 | [Item] | [Function] | [Mode] | [Effect] | [1-10] | [Cause] | [1-10] | [Detection] | [1-10] | [S×O×D] | [Action] |

RPN Action Thresholds:
>200: Critical - Immediate action
100-200: High - Action plan required
50-100: Medium - Consider action
<50: Low - Monitor

Risk Management Report Summary

RISK MANAGEMENT REPORT

Product: [Device Name]
Date: [Date]
Revision: [X.X]

SUMMARY:
- Total hazards identified: [N]
- Risk controls implemented: [N]
- Residual risks: [N] Low, [N] Medium, [N] High
- Overall conclusion: [Acceptable / Not Acceptable]

RISK DISTRIBUTION:
| Risk Level | Before Control | After Control |
|------------|----------------|---------------|
| Unacceptable | [N] | 0 |
| High | [N] | [N] |
| Medium | [N] | [N] |
| Low | [N] | [N] |

CONTROLS IMPLEMENTED:
- Inherent safety: [N]
- Protective measures: [N]
- Information for safety: [N]

OVERALL RESIDUAL RISK: [Acceptable / ALARP Demonstrated]
BENEFIT-RISK CONCLUSION: [If applicable]

APPROVAL:
Risk Management Lead: _____________ Date: _______
Quality Assurance: _____________ Date: _______

Decision Frameworks

Risk Control Selection

What is the risk level?
        │
        ├── Unacceptable ──► Can hazard be eliminated?
        │                    │
        │                Yes─┴─No
        │                 │     │
        │                 ▼     ▼
        │            Eliminate  Can protective
        │            hazard     measure reduce?
        │                           │
        │                       Yes─┴─No
        │                        │     │
        │                        ▼     ▼
        │                   Add       Add warning
        │                   protection + training
        │
        └── High/Medium ──► Apply hierarchy
                            starting at Level 1

New Hazard Analysis

Question If Yes If No
Does control introduce new hazard? Analyze new hazard Proceed
Is new risk higher than original? Reject control option Acceptable trade-off
Can new hazard be controlled? Add control Reject control option

Risk Acceptability Decision

Condition Decision
All risks Low Acceptable
Medium risks with ALARP Acceptable
High risks with ALARP documented Acceptable if benefits outweigh
Any Unacceptable residual Not acceptable – redesign

Tools and References

Scripts

Tool Purpose Usage
risk_matrix_calculator.py Calculate risk levels and FMEA RPN python risk_matrix_calculator.py --help

Risk Matrix Calculator Features:

  • ISO 14971 5×5 risk matrix calculation
  • FMEA RPN (Risk Priority Number) calculation
  • Interactive mode for guided assessment
  • Display risk criteria definitions
  • JSON output for integration

References

Document Content
iso14971-implementation-guide.md Complete ISO 14971:2019 implementation with templates
risk-analysis-methods.md FMEA, FTA, HAZOP, Use Error Analysis methods

Quick Reference: ISO 14971 Process

Stage Key Activities Output
Planning Define scope, criteria, responsibilities Risk Management Plan
Analysis Identify hazards, estimate risk Hazard Analysis
Evaluation Compare to criteria, ALARP assessment Risk Evaluation
Control Implement hierarchy, verify Risk Control Records
Residual Overall assessment, benefit-risk Risk Management Report
Production Monitor, review, update Updated RM File

Related Skills

Skill Integration Point
quality-manager-qms-iso13485 QMS integration
capa-officer Risk-based CAPA
regulatory-affairs-head Regulatory submissions
quality-documentation-manager Risk file management